Completed Projects.
- STPC: Pre-commission Commissioning of POLY-F & Utility units, PET-2 . (MP)
It is necessary to mention that all operation has been effected without attending and technical assist of DCS/ESD control systems forigen vendors and includes re-engineering and re-writing related Data Bases by relying on Iranian experts of the company.
- STPC: Pre-commission and Commissioning of POLY-H unit, PET-2 . (ECC)
- STPC: Pre-commission Commissioning of Control Systems and Field Instruments, PTA-2 . (MP)
- FARSA Chimi (JPC): Installation, pre-commission & commission instrument of MEG plant. (CC)
- Laleh Petrochemical: Efficient Cooperation for completing the installation & pre-commission. (C)
- FARSA Chimi (JPC): Maintenance of Electrical, Instrument and Control systems of MEG plant. (MP)
- JPC: Interlock, loop and Function Checking of Packages and Furnaces for Olefine plant. (MP)
- FPC: Pre-commissioning and Commissioning of Electrical, Control and Instrumentation systems for Fajr-1 Petrochemical Expansion project jointly with Main German EPC contractractor MAN Ferrostaal Power Industry Gmbh. (PCC)
- PPC: Hand Shaking and Communication of two FCS between PARS SM and Arya Sasol Olefine plant. (EPCC)
- ASPC: Implementation the Communication of all Control data through FO (Fiber Optic) between Arya Sasol Petrochemical and Assalouye Seaport (Bandar). (EPCC)
- PPC: Expansio the existing control system and Designing, Engineering, Procurement, Construction and Commissining of new FCS for 3 new Dryers. (EPCC)
E: Engineering, P: Procurement, C: Construction/Commissioning, MP: Man Power فارسی
|