Objective: Plant Resource Manager (PRM) implements the management of equipment modules and control modules, according to the physical structure in the plant hierarchy, according to the physical network configuration, and by control module type. With these functions, the online adjustment, diagnosis management & maintenance tasks of equipment and control modules can be performed more efficiently. PRM is positioned in the higher level of a field network in a plant system structure. It also works together with a computerized maintenance management system and with plant operation functions.Course Duration: 3 DaysLocation: Adico Training Center (ATC) Existing Hardware / Software: - 6 Nos. PC's (5HIS+1EWS) With WinXP SP2 OS
- Installed Centum CS3000 R3.08 & PRM R2.06
- FCS type AFV10D with all type IO connected to ProsafeRS via Vnet/IP network and Engineering station
- Complete Segment Devices (field barrier, Transmitter, Positioner and Bus Terminator)
- Complete Pilot Plant Equipped with all type loops (P, T, F, L)
Participants: Technicians and Engineers who responsible for Field bus engineering Configuration and modification of field bus device parameters. Prerequisite: - Familiar Participants with:
- Field Bus Fundamental
- Yokogawa CS3000 Fundamental
Contents Topics: - Overview of Plant Resource Manager
- PRM and ORACLE Installation
- Basic operations of PRM
- Registration and Deletion of Control modules
- Management of Maintenance Information
- Message Management
- Adjustment and Diagnosis
- Device path configuration definition
- Management of FF Devices, HART Devices and Classical I/O Devices
After taking this Course the Trainee will be able to do: - Data gathering from all field devices – Device Database
- Management of field devices
- Maintenance of field devices
- Tuning and diagnostic of field devices
|